Artist's rendering of Site C dam on Peace River. The B.C. government is expected to decide this year whether to start construction in 2015.

Don’t rush Site C dam, mayor urges

The community most affected by the proposed third dam on the Peace River is urging the B.C. government to get more answers

The community most affected by the proposed third dam on the Peace River is urging the B.C. government to get more answers before going ahead.

Hudson’s Hope Mayor Gwen Johansson made the rounds of Vancouver media this week, backed up by a consultant’s report that questions the need for the $8 billion project assessed by a federal-provincial joint review panel this spring.

Energy Minister Bill Bennett has said the cabinet will consider the federal panel’s report and decide this fall whether to issue permits to allow construction to begin in 2015.

The report by planning and engineering consultants Urban Systems reinforces many of the doubts expressed by the joint review panel, including the cost of the dam and the alternatives available to meet anticipated power demand.

Those options include upgrading the gas-fired Burrard Thermal generating station in the Lower Mainland. The federal review estimated that upgrade could be done for the $1 billion that BC Hydro would pay in interest on the debt generated by the Site C dam.

Urban Systems looked at other options, including geothermal, solar, new natural gas generation and “microgrids” with distributed power from solar or other small sources.

Johansson said the dam would flood more productive farmland in the Peace River valley, and commit the region to another big power source for 100 years at a time when small, distributed sources are becoming competitive.

“Hudson’s Hope has done its bit,” Johansson told CBC radio Wednesday. “We have suffered the consequences of the Bennett Dam and Peace Canyon dam. If there are alternatives I think we should have a really close look at them.”

The Urban Systems report compares Site C’s estimated power cost of $110 per megawatt hour with a new gas cogeneration plant in Calgary that is expected to cost $30 per megawatt hour.

Johansson echoed the joint review panel and NDP leader John Horgan’s call for Site C to be reviewed by the B.C. Utilities Commission, to assess its cost estimates and BC Hydro’s projections for future electricity demand.

 

Just Posted

Port Hardy approves the first step towards new subdivision

Mayor and council pass rezoning needed for new development

Windmill blade display finds a home in Port Hardy

The blade will be installed on the corner of Highway 19 and the Bear Cove Highway

Port Harvey shipyard greenlit

Bylaw 895 has been adopted by RDMW

Port McNeill Volunteer Fire Department appoints deputy chief

Port McNeill Fire Chief Dean Tait has appointed 10+ year firefighter veteran… Continue reading

Port McNeill in Focus: Childcare Availability Crisis a Good News/Bad News Story

On average, childcare across the country is unavailable, unaffordable, and the quality varies.

VIDEO: After the floods, comes the cleanup as Grand Forks rebuilds

Business owners in downtown wonder how long it will take for things to go back to normal

Study recommends jurors receive more financial and psychological support

Federal justice committee calls for 11 policy changes to mitigate juror stress

Research needed on impact of microplastics on B.C. shellfish industry: study

SFU’s department of biological sciences recommends deeper look into shellfish ingesting microbeads

B.C. dad pens letter urging overhaul of youth health laws after son’s fatal overdose

The Infants Act currently states children under 19 years old may consent to medical treatment on own

Singh sides with B.C. in hornet’s nest of pipeline politics for the NDP

Singh had called for a more thorough environmental review process on the proposal

VIDEO: B.C. woman gets up-close view of Royal wedding

Kelly Samra won a trip back to her home country to see Prince Harry and Meghan Markle say ‘I do’

30 C in B.C., 30 cm of snow expected for eastern Canada

It might be hot in B.C., but the rest of Canada still dealing with cold

Horgan defends fight to both retain and restrict Alberta oil imports

Alberta says pipeline bottlenecks are kneecapping the industry, costing millions of dollars a day

Police release video on how to ‘run, hide, fight’ if there’s an active shooter

Vancouver police offer video with input from E-Comm, BC EHS, Vancouver Fire and Rescue

Most Read